V0 Progress Build
Had the opportunity to start making the build... see below.
Putting those M2 nuts into the slot was a tight fit... using a screw to place them and the pliers to fit flush. |
After the first build session. As much as I can build without the missing parts: Loctite, Motors and Drag chain. |
Close up of the linear rail trolley, appears to be missing ball bearings. |
The Z frame assembly partially installed. |
Using a few screws to stop the darn nuts from slipping out. Also the tissue was there in place to assist with the nuts not slipping out on one side. A test of patience. |
The M2 but guide rails done. With the inserting of the nuts, there was a natural bow, but no issues installing within the 1515 rails. |
Almost all of the parts printed and ready to go, except for the Pocketwatch (now printed) and the base skirts and feet’s. |