V0 Progress Build

Had the opportunity to start making the build... see below. 

Putting those M2 nuts into the slot was a tight fit... using a screw to place them and the pliers to fit flush.

After the first build session. As much as I can build without the missing parts: Loctite, Motors and Drag chain.

Close up of the linear rail trolley, appears to be missing ball bearings. 

The Z frame assembly partially installed. 

Using a few screws to stop the darn nuts from slipping out. Also the tissue was there in place to assist with the nuts not slipping out on one side. A test of patience. 

The M2 but guide rails done. With the inserting of the nuts, there was a natural bow, but no issues installing within the 1515 rails. 

Almost all of the parts printed and ready to go, except for the Pocketwatch (now printed) and the base skirts and feet’s. 

Comments

Popular Posts